(+86)13943297765

sichuanjunchi@163.com

MAIN BUSINESS
MAIN BUSINESSFlue system
MAIN BUSINESS
Flue system

The flue system is composed of smoke pipe, bracket, expansion joint, access port, maintenance platform, dust cleaning port and flue ramming. The flue gas produced in the furnace is discharged by two flue pipes and then merged into one, which is connected to the energy and environmental protection system.

The flue is welded structure, and the upper part of the flue is provided with a manhole. The flue is insulated by flue resistant materials, and all the anchoring parts are welded in the flue.


10.烟道系统.jpg

 

友情链接: Qingcheng Group

联系电话: (+86)13943297765(高经理)13944278589(刘经理) 18583278817(肖经理)

企业邮箱: sichuanjunchi@163.com

公司地址: No.2, Lafarge Avenue, Dujiangyan City, Chengdu, Sichuan

微信公众号

CDQCJT2022

骏驰抖音号

84589762945

Copyright © 2000-2025 Sichuan Junchi Metallurgical 备案号: 蜀ICP备2024081930号-1

公众号

微信扫一扫

抖音号

抖音扫一扫

84589762945

联系电话

(+86)13943297765

返回顶部